• The Grotto Pool Restoration

    Before work began on the major part of the restoration, we spent several weeks in February clearing trees that had been clear felled from the base of what was once pool seven, long since drained. Contractors had carried out the tree felling. We were left to collect up the fallen…

    Read More
    0 2414
  • The Natural Play Area

    This was initially an education area Children were introduced to creatures that could be found in the woodland Old tree trunks were piled up as habitat for insects & bugs The area was small but needed regular maintenance There was room however to expand but it was very overgrown. Once…

    Read More
    2 2195